Grovernor House Condominium — Coconut Grove, Miami

Project

Grovernor House Condominium

Coconut Grove, Miami

Scope of Work

Moisture migration from Terrace 2702 had driven underlayment bleed-through, staining ceilings in the units below. We stripped the failed assembly—tile and mortar to bare concrete—then prepared the slab for a new waterproofing layer.

We installed a Sika Roofpro assembly, rebuilt the topping slab, and reinstalled tile so the terrace drains and performs as designed.

Got a Problem with Your Building? Let's Fix It.

We're ready to inspect, quote, and get to work. No fluff, just solutions.